Mold In The Production Process
Do you know how many procedures does it take to complete a Plastic Injection Molding Tooling? This process is very and complicated.
1. product 3D drawing.
2. basic on 3D drawing,engineer start mold design.
3. after mold design,we get dimensions for the mold tooling.
4. cuotom a mold base and mold core.
5. CNC rough machining for upper mold core and lower mold core.
6. EDM finish machining for upper more core,lower mold core and other mold inserts.
7. mold assembly.
8. mold test on plastic injection machine.
9. confirm the final Plastic Injection Molded Product sample with client.
10. done.
Normally it will take about 35 days to make new mold. For Toilet Seat Cover Mould,it will take about 45 days. Before mold making, we can offer prototype sample if needed.
If need help on product design,we can also help finish the 3D drawing.
We will send your final pruduct to confirm until you are satisfied.After confirm the final product,we will delivery mold to you.
© Copyright: 2024 Xiamen Jingzhong Mold Co., Ltd. All Rights Reserved.
IPv6 network supported